12-inch LF driver · TF1230 series · 75 mm voice coil · 300 W
8 Ω · 50–4000 Hz
£85.00
SteadyLean Audio · 2 in stock · All 3 offers
Manufacturer response and impedance data, with source and trace details below. The left and right arrow keys read every shown curve at a frequency, a twelfth of an octave at a time, or an octave with Shift. Escape clears the reading.
These plotted lines are Bits digitizations of manufacturer evidence, not new measurements. How provenance works
LF frequency response
Frequency response

Celestion TF1230S is a 12-inch 8 ohm LF driver rated at 300 W RMS. The validated T/S data includes Fs 60 Hz, Qts 0.37, Vas 54.4 L, Xmax 4.5 mm, sensitivity 96.5 dB, plus 239 cm³ Vd and 143 EBP. bits tracks UK, EU and US shop prices, price movement, datasheet links, simulator import data, and similar drivers, with a current best price of £85.00.
The published T/S values agree with each other
† Calculated by bits from the published values
What this validation status means




























Choose the published values that matter to your design. Size stays matched to this driver.
| Shop | Price | Against the lowest | Stock | Link |
|---|---|---|---|---|
Lean Audio | £85.00, the lowest price | 2 in stock | Visit shop at Lean Audio | |
Thomann Not currently listed · Last seen 26 Aug 2026 · 6–8 weeks | £90.00 | 5.9% above the lowest price | In stock | Visit shop at Thomann |
Lean Business | £95.00 | 12% above the lowest price | Stock not listed | Visit shop at Lean Business |
Tracked since 1 Apr